New Attached ADU

New Attached ADU

Location

Redwood City, CA

Fee

~$2800

Turnaround Time

3 weeks

Permit Approval Time

1 month

Scope of Work

  • Provided architectural design (via our partner)
  • Prepared structural drawing set and calculation set for a new 1-story ADU, which includes a bedroom and bathroom