
Garage Conversion into ADU
Location
Palo Alto, CA
Fee
~$3500
Turnaround Time
3 weeks
Permit Approval Time
2 months
Scope of Work
- Converted an existing detached garage into a new 1-story custom ADU
- Designed structural drawing and calculation sets for the full foundation, floor framing, lateral resisting system and roof framing



